Przejdź do głównej treści

Cargo terminal

Cloudy Cloudy 22°C 13/07/2026 (Mon)

The cargo terminal was built in response to local market demand. The airport and cargo terminal are conveniently located, with good connections to the road network (A2, S12, S17, S19) and railways. They border the ŚWIDNIK Regional Industrial Park Sp. z o.o. The location is on the eastern border of the European Union, in the immediate vicinity of the most important border crossings and transshipment terminals.

Infrastructure

Airport

  • Airport International airport, open 24 hours a day;
  • Navigation aids D-VOR/DME, PAPI (on RWY 07 and RWY25), ILS Cat II (RWY 25);
  • Runway dimensions: 2,520 m x 45 m with artificial surface;
  • Fire protection – category 7.

Cargo services

  • Registered agent status;
  • Handling of goods for export and import;
  • Comprehensive preparation of goods for air, RFS, and road transport;
  • Cargo security control;
  • Acceptance of shipments for air transport;
  • Loading and unloading of goods from aircraft, loading and unloading of trucks;
  • Handling of transport documentation;
  • Notification of the recipient or forwarder of the arrival of goods;
  • Storage of general goods in a warehouse (if necessary, possibility of adaptation to permanent handling of special goods);
  • Consolidation of shipments;
  • Cooperation with a customs agency;
  • Direct proximity to a customs office.

Equipment

  • CCTV system;
  • X-ray machine measuring 180×150 cm;
  • Highloader Trepel Champ 70W;
  • Highloader Trepel Champ 140;
  • Workstations for building ULD units;
  • Forklift truck with a lifting capacity of up to 8000 kg;
  • Unloading/loading ramp;
  • Two electric forklifts with a lifting capacity of up to 1500 kg and manual pallet trucks.

Contact:
[email protected]
tel.: +48 81 458 1360
SITA: LUZOPXH